星空传媒天美传媒有限公司,天美麻花星空高清MV播放音乐,星空影院电视剧免费播放,星空无限传媒在线观看电视剧如何,星空影院电视免费观看,星空影院免费观看电影

KAKULA COPPER MINE UNDERGROUND DEVELOPMENT CONTINUES SIGNIFICANTL AHEAD OF SCHEDULE
Updated:2020.07.07
From:Industrial Investment Department
  |
KOLWEZI, DEMOCRATIC REPUBLIC OF CONGO – Ivanhoe Mines (TSX: IVN; OTCQX:IVPAF) Co-Chairs Robert Friedland and Yufeng “Miles” Sun announced today that underground development at the Kakula Copper Mine continues to exceed expectations with more than 17 kilometres now complete, which is 5.1 kilometres ahead of schedule. In June, the mining team achieved 1,729 metres of underground development – 575 metres ahead of plan for the month. 
 
Regarding the mine construction, Kakula’s decline conveyor system that will transport ore from underground to surface now is operational. The conveyor system has the capacity to transport 2,000 tonnes of ore per hour from underground to surface. The conveyor system substantially shortens the haulage distance for the mine’s truck fleet; significantly increasing productivity, and lowering mining and maintenance costs.
  
First ore being dumped to the underground ore bin (Left) and
transport through rock handling system to the surface (Right)
 
The construction progress on the processing plant and other surface infrastructure remains on track for initial production in Q3 2021.
Share on WeChat Moments ×
Open WeChat and click on "Discover" at the bottom,
Use 'Scan' to share web pages on your Moments.
欢迎光临: 宣威市| 县级市| 武宣县| 卫辉市| 游戏| 南通市| 固镇县| 思茅市| 新营市| 迭部县| 西贡区| 达拉特旗| 武穴市| 石门县| 宁陕县| 安塞县| 盐边县| 尼玛县| 达尔| 肇源县| 永城市| 九江县| 灵台县| 会昌县| 红原县| 马关县| 孟连| 松桃| 万年县| 鹤壁市| 金秀| 蒲城县| 内江市| 铜梁县| 富顺县| 克拉玛依市| 德兴市| 东港市| 博野县| 泾阳县| 上杭县|